Added to favourites
Removed from favourites
Added to mail alerts
Removed from mail alerts
`

Al Zorah Development

Owner Ajman Government
Solidere
Estimated Value US$ 544,000,000
Sector Infrastructure
Sub Sector Mixed-Use Development
Country United Arab Emirates (UAE)
City Ajman
Capacity 5.4 million sq m (coastal land), 22 million sq m of yield gross floor area, 700,000 sq m Golf Course Feasibility Start Date Q4-2007
Status On Hold/Shelved Project End Date Q4-2020
Owner Ajman Government
Solidere
Estimated Value US$ 544,000,000
Sector Infrastructure
Sub Sector Mixed-Use Development
City Ajman
Country United Arab Emirates (UAE)
Capacity 5.4 million sq m (coastal land), 22 million sq m of yield gross floor area, 700,000 sq m Golf Course
Feasibility Start Date Q4-2007
Status On Hold/Shelved
Project End Date Q4-2020


Project Overview


Background

A joint venture was created between Solidere & Ajman Government in order to develop Al Zorah. The project is a free zone and freehold status master plan that will consist of multiple phases. The project is expected to be completed by the end of 2020.


Scope of Work

The project will involve an inland creek extending over 2 square kilometers wetlands. The golf course covers 700,000 square meters and consist of 18-hole par-72. It will also feature 120 parcels within a high rise spine extending a 3 kilometer long with 2.6 million square meter gross floor area.

Phase one “the magnet”:

  • 2 five star resort hotels
    1. Oberoi resort hotel
    2. LUX resort hotel
  • Golf course (par-72, 18 hole, 700,000 sq m)
  • Golf club house
  • Golf view villas
  • Boardwalk
  • Beach club (140 meters sandy beach)
  • Beachfront residences
  • Outdoor pools
  • Nightclubs
  • Wellness center
  • 2 serviced residential buildings
    1. Linear park residences
    2. Marina square residences
  • 4 marinas
  • Visitors pavilion (3,500 sq m)

Overall scope:

  • Pristine sandy beach
  • Tidal lagoons (inland creek)
  • Mangrove forest
  • Scenic parkway
  • Fish nursery
  • Landscaped gardens
  • Pathways
  • Championship golf course
  • Beach volleyball area
  • Soccer field
  • Basketball court
  • Natural trails for sports
  • Playgorunds
  • Narrow roads
  • Café
  • Schools
  • Water sports center
  • Wellness center
  • Dining outlets
  • Retail outlets
  • Entertainment hubs
  • Parks
  • Plazas
  • Pedestrian routes
  • Waterfront (12 km)
  •  Five zones
    1. Beachfront
    2. Peninsula
    3. Creekside
    4. Championship golf course
    5. Gateway
  • Private villas
  • Serviced residences
  • Beachfront resort
  • Beachside boardwalk
  • Creekside boardwalk
  • Retail boardwalk
  • Promenade
  • Mangrove exploration trail
  • Al Zorah resorts
  • Marina square
  • Central marina leisure and tourist hub
  • Marina and hotel development
  • Pedestrian retail spine
  • Linear park
  • Lifestyle center
  • High rise spine (3 km long, 2.6 million sq m (gross floor area))
  • 120 parcels
  • Golf club
  • Related facilities


Additional Notes

Al Zorah Development is a company established to develop and operate the project in order to position Al Zorah as a vibrant tourist destination.

Arup is responsible in practicing their well-known sustainability consultancy works for the scheme.

Dar Al Handasah has been awarded the design and infrastructure contract for the major project alongside COWI Leading Consultant Group assistance. Dar Al Handasah's responsibilities included the following:

  • Tendering documents
  • Preliminary and detailed design
  • Infrastructure utilities constructional supervision

Solidere is responsible for the master plan, strategy, marketing, professional services, and projects development. Visionnaire Development Consulting is assisting Solidere with the master plan as well as preliminary feasibility studies. Part of their job also includes translating the tenets of the development strategy into a new master plan with a particular focus on phase one.

As part of Visionnaire's responsibility, they will also prepare development briefs, regulatory plans, urban development and architectural guidelines for saleable 120 parcels within the high rise spine.

China Harbour Engineering Company Ltd. Is responsible for marine and concrete engineering works for package 1 of the scheme.

Ajman Investment & Marketing Services (AIMS Group) has been awarded the enabling works contract for the major project.

Design of the hotels was awarded to NORR Limited and Lissoni Associates.

BESIX has been awarded the EPC contract for the five star hotel in Al Zorah for phase 2 works which include carrying out construction, maintenance and completion of the scheme in hand.

EIH Limited will be responsible for operating the Oberoi resort in Al Zorah Development.

Nicklaus Design has been appointed by the clients to carry out the design services for the championship golf course.

Proscape Group is responsible for constructing the golf course and for MEP services.

Troon Golf will be the operator for the golf course.

Turf Ecosystems will carry out site assessment for the golf course and will use their new development called Platinum TE.


Related Companies


Owner

Ajman Government
Al Rmaylah
Tel: +971 6701 6666
Email: [email protected]
Web: www.ajman.ae
Solidere
Index Tower, Office 2003, DIFC
Tel: +971 4376 1000
Web: www.solidere.com

EPC

Pre Qualified

BESIX
Avenue des Communautes 100, 1200
Tel: +32 24 0262
Email: [email protected], [email protected], [email protected]
Web: www.besix.com
Proscape Group
6th floor, Building 3, Bay Square, Business Bay
Tel: +971 4277 0244
Email: [email protected]
Web: www.proscapegroup.com

Short Listed

BESIX
Proscape Group

Sub-contractor

Pre Qualified

Ajman Investment & Marketing Services (AIMS)

Tel: +971 6705 3555
Email: [email protected]
Web: www.aimsgroup.com
Arup Group
13 Fitzroy Street, W1T 4BQ
Tel: +44 20 7636 1531
Email: [email protected]
Web: www.arup.com
China Harbour Engineering Company
9/F, China Harbour Building,370-374 King’s Road, North Point,Hong Kong, China
Tel: +852 28 878 118
Email: [email protected]
Web: www.chec.bj.cn
COWI Leading Consultant Group
2800 Kongens Lyngby, Parallelvej 2
Tel: +45 5640 0000
Email: [email protected]
Web: www.cowi.com
Dar Al Handasah (Shair and Partners)
Verdun Street 11-7159
Tel: +961 179 0003, +961 179 0002
Email: [email protected], [email protected]
Web: www.dargroup.com
Lissoni Associati
Via Goito 9, 20121 Milano
Tel: +39 02 657 1926
Email: [email protected]
Web: www.lissoniassociati.com
Nicklaus Design
11780, Highway one, Suite 500, North Palm Beach, Florida 33408
Tel: +1 561 227 0300
Web: www.nicklaus.com
NORR
Emirates Towers, 3rd Floor, Dubai
Tel: +971 4330 4400
Email: infodxb.norr.co.ae
Web: www.norr-international.com
Proscape Group
6th floor, Building 3, Bay Square, Business Bay
Tel: +971 4277 0244
Email: [email protected]
Web: www.proscapegroup.com
Turf Ecosystems
6900 Daniels Pkwy, STE 29-323, Fort Myers, FL 33912
Tel: +1 770 883 3800
Email: [email protected]
Web: www.turfecosystems.com
Visionnaire Development Consulting
Suite 401, Henry Wood House, 2 Riding House Street, W1W 7FA
Tel: +44 203 770 6860
Email: [email protected]
Web: www.visionnaire.eu

Operator

Pre Qualified

Al Zorah Development
UAE Building 1 Al Zorah
Tel: +971 6703 0100
Web: www.alzorah.ae
EIH Limited
Mangoe Lane 4, Kolkata 700 001
Tel: +91 33 4000 2200
Email: [email protected], [email protected]
Web: www.eihltd.com
Troon Golf
15044 N, Scottsdale Road, Suite 300 Scottsdale, Arizona 85254
Tel: +1 480 606 1000
Email: [email protected]
Web: www.troongolf.com

Related Contacts


Al Zorah Development

Name: Strachan Fitzpatrick
Designation: Project Manager
Telephone:+971 55 336 0495
Name: Andrew Ferguson
Designation: Commercial Manger
Email Address: [email protected]

Arup Group

Name: Neil Walmsley
Designation: Director, Middle East Planning Leader
Telephone:+971 4550 7300
Email Address: [email protected]
Linkedin:View
Twitter: twitter.com/greydog1853
Name: Stuart Clarke
Designation: Associate Director, Middle East Façade Engineering Leader
Email Address: [email protected]
Linkedin:View

BESIX

Name: Olivier Crasson
Designation: Executive Vice President, Business Development
Email Address: [email protected]
Linkedin:View

Solidere

Name: Salim Fleyfel
Designation: Project Manager
Email Address: [email protected]


Updates

Sep 2016

The project has been put on hold due to unknown reasons.

Jul 2016

Schematic design works on phase 2 has been completed.

Jun 2016

Phase 1 of the project has been completed.

Apr 2016

The first phase of the development is near completion. 

Aug 2015

The pavilion works have been completed.

Aug 2015

Completion date of the golf course has been moved to early 2017. EIH Limited has also announced the launch of Oberoi resort by the second quarter of 2016.

Feb 2015

Solidere has announced that the estimated completion date for the Golf Villas will be late 2016.

Aug 2014

Design works of the golf villas have been finalized and ready for the next stage. Oberoi resort hotel is under construction with 10 per cent being completed.

Sep 2013

BESIX scooped the EPC contract for phase 2.

Feb 2012

China Harbour Engineering Company Ltd. has been awarded the marine engineering works for phase 1 of the scheme.

Jan 2012

The project has been revived. 

Aug 2009

The project was put on hold due to financial issues. It is expected to be re-launched in a few years.

Jul 2008

The master plan for the scheme will be done in house by Solidere. Furthermore, multiple sub-contracts have been awarded to COWI, Arup, and Dar Al Handasah.

Jun 2008

The enabling contract for the master scheme has been awarded to AIMS Group.

Oct 2007

The JV of Solidere & Ajman Government has announced plans to develop a major project called Al Zorah Development.


Location